Carnahan Wastewater Pump Station Removal Project Open House @ The Apostolic Church
Dec 20 @ 5:00 pm – 6:00 pm

This project will include the removal of existing Carnahan Wastewater Pump Station #22 and installation of a new gravity main sewer system. The project is north of SE 29th Street to SE 28th Court, and east of SE Golden Ave.

For more information, please call Zach Stueve, city wastewater engineer, at 785-368-3122.

Jan
10
Thu
MTPO – Technical Advisory Committee (TAC) Meeting @ 2nd Floor Sunflower Conference Room
Jan 10 @ 2:00 pm
Jan
17
Thu
MTPO – Complete Streets Advisory Committee (CSAC) @ 1st Floor Holliday Conference Room
Jan 17 @ 3:30 pm
Jan
24
Thu
Metropolitan Topeka Planning Organization (MTPO) – Policy Board Meetings @ Holliday Building 1st Floor Conference Room
Jan 24 @ 1:30 pm
T-291057.00 Ash Street Pump Station Force Main Replacement Open House @ Holliday Building
Jan 24 @ 5:30 pm – 6:30 pm

T-291057.00 Ash Street Pump Station Force Main Replacement

Project consists of the construction and installation of all required upgrades to the existing pumps, gates, valves, instrumentation and controls, as well as a new force main, to the existing sanitary pump station located at 545 NE Lake St.

For more information please call Michelle Neiswender, City Wastewater Engineer at 785-368-4251.

Feb
14
Thu
MTPO – Technical Advisory Committee (TAC) Meeting @ 2nd Floor Sunflower Conference Room
Feb 14 @ 2:00 pm
Feb
21
Thu
MTPO – Complete Streets Advisory Committee (CSAC) @ 1st Floor Holliday Conference Room
Feb 21 @ 3:30 pm
Feb
28
Thu
Metropolitan Topeka Planning Organization (MTPO) – Policy Board Meetings @ Holliday Building 1st Floor Conference Room
Feb 28 @ 1:30 pm
Mar
21
Thu
MTPO – Complete Streets Advisory Committee (CSAC) @ 1st Floor Holliday Conference Room
Mar 21 @ 3:30 pm